0800 136 993
ServicesCommissioning

Commissioning

Once a UPS or generator has been electrically installed, it should always be set-up and commissioned by an authorised and trained engineer. As a leading service provider, Borri offers commissioning for most brands of UPS & generators.

The commissioning visit includes a survey of the installation environment, a check of the AC and DC wiring, and calibration of the equipment with the onsite voltages. The manufacturer’s start up procedure is carried out by fully testing all functions. The measurements are checked against those completed during factory testing and a full report provided.

Free Site SurveyBorri Live HelpRequest a CallbackBook a Callout
  • D and B Rating 1
  • G and P Batteries Logo
  • NIC EIC Logo
  • Safe Contractor Logo
  • Environment Agency Logo
  • FPAL Logo
  • Borri Eco UPS Logo